1. Belt Splicing

Splices are the weakest section of a conveyor belt. The belt carcass construction determines which joint methods are permitted.

2. Splice Types

Table 1: Splice Type Comparison
Splice Type Joint Mechanism Belt Constructions Static Strength Installation and Cure Principal Limitations
Hot vulcanised steppedPlies cut into matching steps, overlapped with tie-gum and cured under heat and pressureMulti-ply fabric: polyester-polyamide (EP, PN) and polyamide-polyamide (NN)Typically (N - 1) / N of belt strength, where N is the number of plies, e.g. 67% for 3 plies and 75% for 4 plies. Varies with belt construction and splice design. Confirm with the belt manufacturer.Heated press, power supply and trained crew. Total downtime including preparation and cooling can exceed 24 h.Requires a press and power at the splice location
Cold vulcanised steppedSame step geometry bonded with two-part polychloroprene cement at ambient temperature, without a pressMulti-ply fabric, lower tensionLower than hot vulcanised. Sensitive to workmanship and cure conditions.No press. Typically 4 h for a usable cure and 24 h for full cure.Lower heat resistance. Standard cements may not bond to heat-resistant covers.
Finger, thermoplastic fusedInterlocking fingers fused with polyvinyl chloride (PVC) plastisol or polyurethane jointing paste in a heated pressSolid woven PVCBelt manufacturer ratingSingle press setting. Held under pressure until below 70 deg C [158 deg F].Requires templates, punches and a press sized for the full splice
Finger, vulcanisedInterlocking fingers bonded with tie-gum and vulcanisedSolid woven PVC with nitrile rubber covers (PVG), single-ply straight-warp and aramid. Some high-tension multi-ply fabric designs.Belt manufacturer ratingSingle press settingManufacturer-specific geometry and materials
Steel cord overlapCords from each belt end overlap in core rubber. Load transfers between cords by rubber shear.Steel cordUp to 100% of nominal belt strength when correctly madeSingle press setting. Splice length typically 0.6 m [2 ft] at ST 1000 to 4.5 m [15 ft] at ST 5400, longer at higher ratings.Sensitive to workmanship. Verify internal geometry by radiography or magnetic flux leakage (MFL) scan. Apply High Integrity Splicing (HIS) on high-tension belts.
Mechanical fastenerHinged or solid plate fasteners clamped, bolted or riveted through the belt endsMulti-ply fabric, typically up to EP 1000. Solid woven.Fastener manufacturer rating. Typically derate working tension by 20% to 25% relative to a vulcanised splice.No cure. Shortest downtime.Unsuitable for steel cord. Exposed to cleaner and impact damage. Metallic fasteners trip metal detectors unless the detector logic masks the splice. Joint gaps can pass fines.

Note: Static strength does not govern splice life. DIN 22101 bases belt and splice selection on the dynamic splice efficiency, determined by fatigue testing to DIN 22110-3, which is lower than the static strength.

3. Hot Vulcanised Stepped Splices (Multi-Ply Fabric)

Multi-ply fabric belts (EP, PN and NN) are joined with a stepped splice of N - 1 steps, where N is the number of plies, vulcanised under heat and pressure.

Table 2: Hot Vulcanised Stepped Splice Sequence
Step Action Critical Controls Defect if Uncontrolled
1. Mark outAlign the belt ends on the true belt centreline. Mark the bias and step lines.Bias length 0.3 times belt width, or 0.4 times where specified. Step length set by the strength of each ply, to the belt manufacturer's splice instructions.A square splice concentrates dynamic stress at pulleys, idlers and cleaners. Short steps reduce bonded area.
2. Strip and stepAt each step line, cut through the cover and the ply being removed, then peel that ply from the skim rubber. Use induction cover heaters and stripping winches where available.Do not score the ply beneathA cut into an underlying ply reduces its strength across the full splice
3. Buff and cleanBuff all bonding surfaces to a uniform texture. Clean with the manufacturer's solvent, typically ethyl acetate or methyl ethyl ketone (MEK).Do not overheat the rubber. Do not use degreasers, mineral spirits or unfiltered compressed air. Control ignition sources, as both solvents are flammable. Substrate temperature at least 3 deg C [5 deg F] above the dew point.Scorched or contaminated surfaces bond poorly. Condensation vaporises during cure and leaves voids.
4. AssembleApply cement and tie-gum, lay the steps together and rebuild the covers with cover compound of the belt cover gradeMaterials within shelf life, typically 6 months at 21 deg C [70 deg F] or 12 months at 10 deg C [50 deg F]. Do not use tie-gum as cover rubber.Aged compound flows poorly during cure. Tie-gum covers have lower abrasion resistance than cover compound.
5. CureCure in a heated press. Long splices can be cured in more than one press setting.Temperature, pressure and time to the manufacturer's cure table for belt thickness and compoundUnder-cure. Over-cure at press overlaps.
6. Cool and releaseHold full press pressure until the splice cools to approximately 70 deg C [158 deg F], or the manufacturer's release temperature, then releaseDo not tension the belt until the press is removedBlistering and porosity
7. Finish and inspectGrind flash and surplus rubber flush with the belt. Inspect for voids, edge lifting and alignment.Splice thickness matches the parent beltA proud splice strikes cleaners and causes thumping

4. Cold Vulcanised Stepped Splices (Multi-Ply Fabric)

Cold splicing uses the stepped splice geometry bonded with two-part polychloroprene cement at ambient temperature, without a press. Use it on lower-tension fabric belts within the cold-bond system manufacturer's rating.

Table 3: Cold Vulcanised Stepped Splice Sequence
Step Action Critical Controls Defect if Uncontrolled
1. Mark out and stepMark the bias and step lines, cut and peel the pliesBias 0.3 or 0.4 times belt width. Step length set by ply strength. Do not score the ply beneath.Damaged plies and reduced bonded area
2. BuffBuff all bonding surfaces to a uniform textureWithout heat and pressure, adhesion depends on mechanical keyWeak bond
3. Clean and check conditionsClean with the manufacturer's solventSubstrate temperature at least 3 deg C [5 deg F] above the dew point. Confirm cement compatibility with heat-resistant cover compounds.Condensation or an incompatible compound reduces adhesion
4. CementMix the base cement and hardener and apply to both surfacesUse within the manufacturer's open time and expiry dateAged cement bonds poorly
5. AssembleJoin the steps, roll out entrapped air and rebuild the covers. Apply weight over the splice during cure.Uniform contact across the full spliceEntrapped air and unbonded areas
6. CureHold the conveyor stopped through the cure periodTypically 4 h for a usable cure and 24 h for full cure, depending on cement formulation and ambient temperature. Apply the manufacturer's cure time.Loading before cure shears the bond

Note: Cold splices have lower heat resistance than hot vulcanised splices and degrade faster on hot materials such as cement clinker, foundry sand and hot ash.

5. Finger Splices

Finger splices join belts that cannot be stepped: solid woven PVC and PVG, single-ply straight-warp and aramid belts. They also join some high-tension multi-ply fabric designs.

Table 4: Finger Splice Sequence
Step Action Critical Controls Defect if Uncontrolled
1. Mark outMark the fingers with steel templates. Set the splice square or on a bias as the belt manufacturer specifies.Finger length to the belt manufacturer's splice instructionsShort fingers reduce shear area and joint strength
2. Cut fingersCut with heavy-duty saws or pneumatic punchesDo not cut fingers by handIrregular gaps between fingers disrupt tension transfer
3. Prepare surfacesBuff and clean the finger edges for vulcanised splicesSubstrate temperature at least 3 deg C [5 deg F] above the dew pointPoor adhesion and voids
4. Fill and interlockPVC: apply plastisol or jointing paste between the fingers. PVG, straight-warp and aramid: apply tie-gum. Interlock the fingers.Fill every finger gapUnfilled gaps carry no shear
5. CureCure the full splice in a single press settingTemperature, pressure and time to the manufacturer's cure tablePlastisol or rubber flow and finger displacement at a press overlap
6. Cool and releaseHold full press pressure until the joint cools below 70 deg C [158 deg F]. Water-cooled platens shorten the cooling time.Confirm release temperature at the platensWeak, porous joint
7. Finish and inspectTrim flash. Check finger alignment and joint thickness.Joint thickness matches the parent beltUneven joint strikes cleaners

6. Steel Cord Splices

Steel cord belts are joined only by hot vulcanised overlap splices. Use the belt manufacturer's splice design to ISO 15236-4 (formerly DIN 22131-4).

Table 5: Steel Cord Splice Sequence
Step Action Critical Controls Defect if Uncontrolled
1. Align and markOverlap the belt ends, align them on the true belt centreline and mark the biasBias 0.3 times belt width or 0.4 times, unless the splice design specifies a square spliceA misaligned splice mistracks
2. Strip and clean cordsStrip the covers with motorised cord strippers and induction cover heaters. Clean with the manufacturer's solvent.Hold the blade inclined toward the cover to leave a core rubber film on each cord. Do not buff or score through the zinc coating. Substrate temperature at least 3 deg C [5 deg F] above the dew point.Low cord-to-rubber adhesion
3. Cut and lay cordsCut the cords to the lengths in the splice diagram and lay them in the step patternStaggered cord ends. Number of steps and step length to the splice design. Step count rises with cord diameter relative to cord pitch. Typically 1 step up to ST 1600 or ST 2000 and 4 steps from ST 5000 to ST 7500. Use alignment combs to hold the cords parallel.Coinciding cord ends concentrate stress. Misaligned cords.
4. Insert core rubberLay core rubber strips (noodles) or pre-grooved core rubber panels between the cordsMinimum gap approximately 0.25 times the cord diameter. Typically one third of the cord diameter.Cord-to-cord contact removes the shear path
5. Build edges and coversBuild the edges with edge rubber and apply the cover rubberConsolidate the edges fullyExposed outer cords corrode inward (zipper failure)
6. CureCure the full splice in a single press setting. Tighten traverse beams with calibrated torque wrenches in a set sequence.Temperature, pressure and time to the manufacturer's cure table, loggedRubber flow and cord displacement at press overlaps. Voids.
7. Cool and releaseHold full press pressure until the splice cools to approximately 70 deg C [158 deg F], or the manufacturer's release temperatureDo not tension the belt until the press is removedBlistering and porosity
8. InspectInspect cord geometry by radiography (X-ray) or MFL scanCord alignment and core rubber gap to the splice design. Reject any cord-to-cord contact.Geometry errors reduce static and dynamic splice strength

7. High Integrity Splicing (HIS)

Apply HIS to high-tension steel cord belts and to belts where splice failure has a high production or safety consequence. HIS adds engineering controls to the steel cord splicing process to reduce variation in field splice quality.

Table 6: High Integrity Splicing Controls
Control Requirement Purpose
Splicing enclosurePressurised enclosure with heating, ventilation and air conditioning (HVAC)Holds temperature and humidity within the splice material manufacturer's limits. Absorbed moisture vaporises during cure and causes voids.
Cord alignmentLaser alignment jigs and machined aluminium combs over the full splice length, which can reach 4 to 5 m [13 to 16 ft]Keeps the cords parallel and on the splice pattern
Core rubberPre-grooved core rubber panels in place of hand-laid stripsHolds the design gap between cords
Cure controlDigital proportional-integral-derivative (PID) controllers, multi-zone thermocouples and data logging in place of manual gaugesControls and records the full cure profile against the target
Baseline scanRecord a radiograph or MFL scan of every splice after cureSets the baseline for condition monitoring

8. Splice Inspection and Repair

Splices degrade through dynamic fatigue, impact damage and chemical breakdown. Inspect splices routinely by visual, tactile and auditory checks to identify degradation before the belt parts.

8.1 Splice Inspection

Table 7: Common Splice Faults
Condition Indicators Probable Cause Corrective Action
Cover blistering or sponginessTactile softness or visible surface blisteringSubsurface moisture or air entrapment. Under-cure, or press released before cooling.Apply a hot vulcanised spot repair where localised. Replace the splice where blistering covers a large area or reaches the carcass.
Transverse crackingTransverse cracks at the leading or trailing splice endsAbrupt stiffness transition between belt and splice. Pulley diameter below the belt minimum. Square or short splice.Spot repair cover cracks before moisture enters. Check pulley diameters against the belt manufacturer's minimums. Replace the splice where cracks reach the carcass.
Edge fraying and zipper separationFabric ply delamination or protruding steel cords at the edgeOuter step shear failure. Edge tension overload transferring to adjacent cords. Edge contact with the structure from mistracking. Poorly consolidated edge rubber.Correct belt tracking. Rebuild the edge where cords or plies are intact. Replace the splice where cords are broken or corroded.
Step edge liftingLifted cover or ply edge along a step line, visible as a ridgeContaminated or under-buffed bond line. Cleaner blade catching the step edge.Re-bond the lifted edge with tie-gum under a spot press. Check cleaner blade angle and tension.
Finger tip separationFinger tips lifting or cracking along the finger boundariesIncomplete fusion or bond. Fingers too short. Press released before cooling.Spot repair isolated tips. Replace the splice where separation extends along the fingers.
Hourglassing (necking)Local reduction in belt width under tensionInternal shear failure, with cords or plies slipping longitudinallyFailure is imminent. Stop the conveyor and replace the splice.
Splice elongationIncrease in steel cord splice length between successive MFL scansCords pulling through the core rubber under cyclic loadIncrease scan frequency. Schedule splice replacement before necking is visible.
Protruding steel cordsCord ends or broken wires visible through the coverCord displacement during cure, cover wear or cord fatigue failureIsolate the conveyor and assess. Replace the splice where cords are broken.
Corrosion stainingRust staining at cover damage on a steel cord spliceMoisture ingress to the cordsSeal the cover with a hot vulcanised spot repair. Scan by MFL to assess cord loss.
ThumpingRepetitive impact noise at idlers and cleanersSplice profile cupped or thicker than the beltGrind a proud splice flush. Investigate cupping, which can indicate internal separation.
Splice mistrackingBelt moves laterally each time the splice passes a pulleyBelt ends not aligned on the true belt centreline, or bias errorRe-make the splice with the belt ends aligned on the true belt centreline
Accelerated cover wearSplice cover thinner than the adjacent belt, or scoredTie-gum used as cover rubber, wrong cover compound or over-tensioned cleanerRebuild the cover with cover compound of the belt grade. Reset cleaner tension.
Cold splice heat degradationHardened, cracked or debonding cold splice on hot dutyCold splice operating above its heat resistanceReplace with a hot vulcanised splice
Fastener damageLoose, cupped or broken fastener plates or hinge pins. Carcass tearing along the fastener line.Fastener undersized for belt thickness, pulley diameter below the fastener minimum, or cleaner impactReplace damaged fasteners. Re-cut the belt end square and refit where the carcass is torn. Plan a vulcanised splice where damage recurs.

8.2 Repair Methods

Table 8: Splice Repair Methods
Method Description Application Limitations
Hot vulcanised spot repairRoute out damaged rubber to the carcass, clean, fill with tie-gum and cover compound, then cure with a spot pressCover gouges, cracks and blisters, to seal against moisture ingressDoes not restore tensile capacity where cords or fabric are damaged
Hot vulcanised edge repairRemove damaged edge rubber, buff, rebuild with edge rubber and cure with a spot pressFrayed or abraded edges with intact cords or plies. Restores the edge moisture seal on steel cord belts.Not effective where outer cords are broken or corroded
Step edge re-bondLift, buff and clean the separated edge, apply tie-gum and cure with a spot pressLocalised step edge or finger tip lifting where the internal bond is soundNot suitable where separation extends into the splice body
Cold bond repairFill gouges or scuffs with two-part polyurethane compounds or cold-vulcanising cementsTemporary cover repair where a spot press is unavailable. Cure time to the compound manufacturer's instructions.Limited abrasion resistance. Primary belt cleaners can remove the repair.
Grinding flushGrind proud splice rubber flush with the beltThumping and cleaner impact from a thick spliceDoes not correct cupping caused by internal separation
Mechanical fastener reinforcementFit solid plate fasteners across a delaminating fabric splice edge to bind the pliesShort-term contingency on fabric belts onlyDo not use on steel cord belts, where fasteners can be ejected under tension
Temporary fastened closureCut out the failed splice and close the belt with mechanical fastenersEmergency return to service on fabric and solid woven belts, within the fastener limits for the beltDerate the working tension. Replace with a vulcanised splice at the next shutdown. Unsuitable for steel cord belts.
Single replacement spliceCut out the failed splice and make one new splicePermanent repair where take-up travel can absorb the belt length consumedConsumes belt length. Confirm the remaining take-up travel before cutting.
Insert (saddle) spliceCut out the failed splice, insert a new section of belting and vulcanise two new splicesPermanent repair where take-up travel cannot absorb a single replacement splice. Restores design capacity.Two splices to make and maintain. Match the insert to the parent belt construction, rating and cover grade.